# Installation

The Control Point intended for permanent installations and must be connected to a Showstopper Base or Showstopper Hub with Showstopper Accessory cable. The Ethernet connections must be conected to the network switch in order to communicate with Spikemark software.

### Flush Mount Control Point

* Install your 8"x8" Electrical Box on or inside your wall
* Install conduit between the Showstopper Base or previous Showstopper Accessory hub
* Run Accessory Cable and Cat5 Cable through conduit
* [Wire your cables into the back of the Control Point](https://docs.creativeconners.com/docs/showstopper/control-point/making-the-connections)
* Attach the green ground wire from the faceplate to the box
* Attach the face plate to the box and and connect the terminator.

### Surface Mount Control Point

* Install the box on the wall. Be sure to use appropriate wall anchors. Holes are cleared for 1/4" hardware

  <figure><img src="https://3040525219-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2F-MhFI6SSKpm8M7EkrYqp%2Fuploads%2Fgit-blob-cde96fff548fb3063053179cf160bf765d0be1e4%2Fcontrol-point-install-box.png?alt=media" alt="Surface Mount Control Point"><figcaption></figcaption></figure>
* Install conduit between the Showstopper Base or previous Showstopper Accessory
* Run Accessory Cable and QTY: 2 Cat5 Cable through conduit
* [Wire your cables into the back of the Control Point](https://docs.creativeconners.com/docs/showstopper/control-point/making-the-connections)
* Attach the green ground wire from the faceplate to the box
* Attach the face plate to the box and and connect the Showstopper Accessory Terminator and Pendant Terminator.
