For the complete documentation index, see llms.txt. This page is also available as Markdown.

Installation

The Control Point intended for permanent installations and must be connected to a Showstopper Base or Showstopper Hub with Showstopper Accessory cable. The Ethernet connections must be conected to the network switch in order to communicate with Spikemark software.

Flush Mount Control Point

  • Install your 8"x8" Electrical Box on or inside your wall

  • Install conduit between the Showstopper Base or previous Showstopper Accessory hub

  • Run Accessory Cable and Cat5 Cable through conduit

  • Attach the green ground wire from the faceplate to the box

  • Attach the face plate to the box and and connect the terminator.

Surface Mount Control Point

  • Install the box on the wall. Be sure to use appropriate wall anchors. Holes are cleared for 1/4" hardware

    Surface Mount Control Point
  • Install conduit between the Showstopper Base or previous Showstopper Accessory

  • Run Accessory Cable and QTY: 2 Cat5 Cable through conduit

  • Attach the green ground wire from the faceplate to the box

  • Attach the face plate to the box and and connect the Showstopper Accessory Terminator and Pendant Terminator.

Last updated

Was this helpful?